Installation
Section 2-2
2-2 Installation
Install the NT20 to the operation panel and connect the power to the NT20 as described below.
2-2-1 Installation Environment
Observe the following points when installing the PT in an operation panel.
!Caution Do not install the NT20 at sites subject to the following conditions.
Otherwise, the product may malfunction.
• Severe temperature variations
• Temperatures or humidities outside the ranges stated in the specifications
• High humidity, condensation
• Splashing chemical agents
• Severe oil splashing
• Corrosive or flammable gases
• Strong vibrations or shocks
• Direct exposure to wind and rain (outdoor sites)
• Strong ultra-violet irradiation
Take adequate measures to ensure shielding if the NT20 is used at a location subject to any of the following conditions.
• Static electricity, or noise from other equipment
• Strong electric or magnetic fields
• Nearby power cables
• Potential exposure to radioactivity
!Caution Do not perform a withstand voltage test. Performing with stand voltage tests may result in malfunction.
21
Installation
Section 2-2
2-2-2 Installation to the Operation Panel
The NT20 can be flush mounted to an operation panel.
Use the panel fittings and tools included in the product package and follow the procedure below.
!Caution During work at the panel, take care to ensure that no metal scraps enter the unit. Otherwise, the product may malfunction.
Note
The thickness of applicable operation panel is 1.6 mm to 4.8 mm. All fittings must be tightened uniformly to a torque of at least 0.5 to 0.6 N·cm in order to ensure water- and dust-resistance. The panel must not be soiled or warped, and must be able to support an installation that will remain secure and strong.
1.
Open a hole, shown below, in the panel and install the NT20 from the front of the panel.
98.5
+0.5 mm
0 mm
178.5
+0.5 mm
0 mm
2.
Attach the panel fittings at four positions, shown below, on the rear of the
NT20.
Fit the hook of the fitting in the square hole in the body and tighten the screw with a Phillips head screwdriver while lightly pulling the fitting.
Note
In order to ensure adequate water and dustproof performance, tighten the four panel fittings uniformly and make sure there are no gaps between the fittings and the NT20 panel.
22
Installation
Section 2-2
2-2-3 Power Supply Connection
Connect a 24 VDC power supply to the power input terminals.
!Caution Carefully check the wiring before turning ON the power.
!Caution Do not connect AC power to the DC terminals. Incorrect wiring may result in burning.
Note
(1) Depending on how the power is turned ON/OFF, the entire system may stop. Follow the correct procedure when turning the power ON/OFF. Otherwise the system may operate unpredictably.
(2) Use DC power supplies with low voltage fluctuation. An incorrect power supply may result in malfunctions.
(3) Do not perform a dielectric strength test. Otherwise, the product may malfunction.
(4) If complying with EC directives (low voltage directives), use a power supply with reinforced insulation (compliance with EC directives is planned for June 1998).
NC
24 V
DC
Circuit breaker
Note
24 VDC power supply
Power Supply
The applicable power supply specifications are as follows.
Item Value
Power supply 24 VDC
Allowable power supply voltage fluctuation range 20.4 VDC to 27.6 VDC
(24 VDC
−15%, +15%)
Power supply voltage capacity 10 W or more
Parts Used for Connection
For the connection to the power supply terminal block, use stranded wire of
2 mm
2
or greater cross sectional Area (14 AWG stranded wire) and M3.5 size crimp terminals.
Tighten the screws on the terminal block to a torque of 0.8 N
⋅m.
Otherwise the product may malfunction.
Fork type Round type
7 mm or less 7 mm or less
Recommended Terminals
Maker
Japan Solderless Terminal MFG
Fuji Terminal
Nichifu Terminal
Fork type Round type Stranded wire size
2-YS3A
2-YAS3.5
2Y-3.5
2-3.5
V2-S3.5
2-3.5
2.0 to 2.63 mm
2
(14 to 13 AWG)
23